KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  5-19-2013
Number of Hours:  2.50
Manual Reference:  Page 8-36
Brief Description:  Fuselage assembly #6

Mounted the F-811 bulkhead and the lower longerons into position.

Clecoed the left and right F-857C seatbelt angles, the F-8008, F-809, and F-810 bulkheads.

Riveted the aft end of the baggagebulkheads to the F-808 bulkhead.

Clecoed the bottom skin in place. It took a little longer than I expecetd, but with one peron, and no assitance from ropes, straps, and so on, it turned out just fine.

Onto riveting.
' style=

Aft bottom skin in place

Aft bottom skin in place

' style=

Bottom skin and bulkheads clecoed into position.

Bottom skin and bulkheads clecoed into position.

' style=

Interior shot of the canoe.

Interior shot of the canoe.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.